Package ”The outer contour”

26500 rub per m2
Foundation (Monolithic Swedish plate)
  • excavation involving recycling
  • manual refinement of stripping
  • sand pouring and rubble by layer-by-layer consolidation method
  • Installation of communication pipes (Sanitation, running water)
  • penoplex with the waterproofing
  • 2 rows of filament
  • casting a concrete
  • the foundation drain
Roof
  • the rafters (dry plinths, platbands)
  • cement-sand tiling BRAAS
  • 1 row of snow retention
  • laminated front dashboards (45-90x300-400)
  • hidden drainage systems
  • mansard windows (up to 3 windows)
  • the waterproofing film
Glazing
  • double glazing, the thickness of the glass pane is calculated according to the formula
  • opening windows
  • glass door to the balcony
  • glazing of the balcony
  • sliding terrace door
Frame
  • support beams are glued in accordance with State standards GOST 20850-2014 on the use of special glues
  • processing of the end faces by sealant
  • sidetracking on the draft
  • delivery and installation
  • fastening elements
  • supplementary waterproofing of the waistrail ( the layer of the Bakelite plywood 20 mm, elaborated further by mastic)
External walls
  • cement bonded particle board
  • waterproofing
  • internal frame

Packaging arrangement "The warm contour"

Price: 46500 m2
Foundation (Monolithic Swedish plate)
  • excavation involving recycling
  • manual refinement of stripping
  • sand pouring and rubble by layer-by-layer consolidation method
  • installation of communication pipes (Sanitation, running water)
  • penoplex with the waterproofing
  • 2 rows of filament
  • casting a concrete
  • the foundation drain
Roof
  • the rafters (dry plinths, platbands)
  • cement-sand tiling BRAAS
  • 1 row of snow retention
  • laminated front dashboards (45-90x300-400)
  • hidden drainage systems
  • mansard windows (up to 3 windows)
  • the waterproofing film
  • nsulation by PAROC 200мм
  • vapor barriers
  • plasterboard of 2 layers
  • roof overhang
  • painting of board
Glazing
  • double glazing, the thickness of the glass pane is calculated according to the formula
  • opening windows
  • glass door to the balcony
  • glazing of the balcony
  • sliding terrace door
Construcion frames
  • lag framework floor
  • waterproofing
  • floor insulation 150 mm
  • sound proofing
  • vapor barrier
  • waterproofing
  • heat-insulated floor
  • sound-insulating screed
  • plasterboard (the ceiling of the first floor)
Terrace
  • pile foundation for terrace
  • floor joist
Frame
  • support beams are glued in accordance with State standards GOST 20850-2014 on the use of special glues
  • antiseptization
  • processing of the end faces by sealant
  • sidetracking on the draft
  • delivery and installation
  • fastening elements
  • supplementary waterproofing of the waistrail ( the layer of the Bakelite plywood 20 mm, elaborated further by mastic)
  • sanding (2 times)
  • painting by German paints ZOBEL or SIKKENS in 3 layers
External walls
  • cement bonded particle board
  • waterproofing
  • internal frame
  • decorative plaster
  • plaster cement bonded particle board (the color upon the agreement with the client)
  • insulation 150 mm – insulator PAROC
  • vapor barriers
  • plasterboard of 2 layers
internal bulkheads on the draft
  • framework
  • insulation 100- 150 mm (PAROC)
  • sound proofing
  • OSB + plasterboard or plasterboard of 2 layers
  • vapor barriers
Floor of the first floor
  • waterproofing of the base plate from the inside
  • insulation 100 mm
  • heat-insulated floor
  • sound-insulating screed

Packaging arrangement "on a turn-key basis"

Price: 85000 m2
Foundation (Monolithic Swedish plate)
  • excavation involving recycling
  • manual refinement of stripping
  • sand pouring and rubble by layer-by-layer consolidation method
  • installation of communication pipes (Sanitation, running water)
  • penoplex with the waterproofing
  • 2 rows of filament
  • casting a concrete
  • the foundation drain
Roof
  • the rafters (dry plinths, platbands)
  • cement-sand tiling BRAAS
  • 1 row of snow retention
  • laminated front dashboards (45-90x300-400)
  • hidden drainage systems
  • mansard windows (up to 3 windows)
  • the waterproofing film
  • insulation with a saw warmer PAROC 200mm
  • vapor barriers
  • plasterboard of 2 layers
  • roof overhang
  • painting of boards
Glazing
  • double glazing, the thickness of the glass pane is calculated according to the formula
  • opening windows
  • glass door to the balcony
  • glazing of the balcony
  • sliding terrace door
Construcion frames
  • lag framework floor
  • waterproofing
  • floor insulation 150 mm
  • sound proofing
  • vapor barrier
  • heat-insulated floor
  • sound-insulating screed
  • plasterboard (the ceiling of the first floor)
Finishing of walls and ceilings
  • painting/ paintable wallpaper
Toilet facilities
  • Laufen or Villeroy boch plumbing
  • shower cabins
  • bath
  • toilets
  • mixers
Electrics
  • all the electrical is placed to connection points (without considering the switches, sockets, lightings, etc)
Heating
  • gas boiler Veismann (to 43 kW)
  • heat-insulated floor connect
  • concealed convector along facade glazing
Frame
  • support beams are glued in accordance with State standards GOST 20850-2014 on the use of special glues
  • antiseptization
  • processing of the end faces by sealant
  • sidetracking on the draft
  • delivery and installation
  • fastening elements
  • supplementary waterproofing of the waistrail ( the layer of the Bakelite plywood 20 mm, elaborated further by mastic)
  • sanding( 2 times)
  • painting by German paints ZOBEL or SIKKENS in 3 layers
  •  
External walls
  • cement bonded particle board
  • waterproofing
  • internal frame
  • decorative plaster
  • plaster cement bonded particle board (the color upon the agreement with the client)
  • insulation 150 mm – insulator PAROC
  • vapor barriers
  • plasterboard of 2 layers
internal bulkheads on the draft
  • framework
  • insulation 100- 150 mm (PAROC)
  • sound proofing
  • OSB + plasterboard or plasterboard of 2 layers
  • vapor barrier
Floors
  • waterproofing of the base plate from the inside
  • heat insulation100 mm
  • heat-insulated floor
  • sound-insulating screed
  • parquet/ engineering plank or ceramic-granite (floor) (up to 3000 rub /m2)
Terrace
  • pile foundation for terrace
  • floor joist
  • larch board "deck"
Kitchen
  • German/ Italian kitchen to 1 million rub.
  • the built in technics Boch, Siemens
Sanitation
  • all the pipes (REHAU) are in the standpipes and withdrawn to way out of building (without broach to external receiver)
Ventilation
  • extract system for sanitary facilities
  • supply and exhaust ventilation( providing 10C lower temperature than on the outside)
  • supporting of the moisture levels

What does the price depend on?

We recommend materials and works that are included in developed by us packaging arrangements. Anyway, we are for individual approach. We are happy to offer the best solution within your budget without loss of quality, for which we take full responsibility.

AT HOME ORDER FROM 250 M2 CASING FOR THE MACHINE AS A GIFT
PROMOTION ACTIVITIES TILL APRIL 30